Gridlink Home

Community-funded grid connections

Get connected without paying for the whole line yourself

Map your route, size your supply, see the real cost, and share the line with the neighbours who need it too. We handle the application from there.

1 people and businesses have already registered across 1 wards.
1 Registered interests
1 Wards with demand
0 m Line routes mapped
0 Applications tracked
1 Approved partners

Everything you can do here

Six tools, all running off the same connection data. Start anywhere.

Connection mapping tool

Drop a pin on the pole you would connect from, then tap or walk the route to your property. Length, poles and a line-by-line cost come back instantly.

RateUSD 14.00/m
Routes mapped0
Typical run
  • Tap the map or walk it with GPS - both give a measured length
  • Itemised estimate: line, poles, wayleave, meter, survey, VAT
  • See instantly what your share drops to if neighbours join

Register your interest

No technical details needed. Drop a pin, tell us what you need power for, and we group you with everyone nearby.

1 people and businesses on the map
Zvishavane Ward 6 1
New

Power needs calculator

Tick your appliances and get your supply size, main breaker, cable, connection cost and monthly bill in one go.

Borehole pump Deep freezer Grinding mill Brooder heater Welder +30 more
Three-bed home with a borehole8.4 kVA, single phase 60A
New

Track your application

Every submission gets a reference. Follow it through all nine stages, from screening to the day the meter goes in.

Nine stages, from application received to meter installed and energised.

Approved partners

Electricians, contractors and suppliers who deliver these connections, rated by the people who used them.

  • Ourugan Construction New listing Solar and ZETDC Installations

Guides and articles

Plain-language answers on connection costs, wayleaves, sharing a line, and what the utility actually requires.

The first guides are being written and will appear here.

Where demand is building

The wards closest to having enough registered demand for a line to be worth building.

Zvishavane Ward 6 1 registered

Add your ward to the board

How it works

  1. 1

    Tell us where you are

    Drop a pin or search your ward. Two minutes, no paperwork.

  2. 2

    We size and price it

    Load, supply size and an itemised cost, checked against network capacity.

  3. 3

    We group you with neighbours

    The line cost splits between everyone who joins the same route.

  4. 4

    Build, meter, energise

    A partner builds it, you follow every stage with your reference.

One line, shared between neighbours, costs each of you a fraction

Register your spot on the map. When enough people near you have done the same, the line gets built and everyone pays their share instead of the whole thing.